NEW BLOCKMOD: SMART 630 KG LIFT MODERNIZATION

OCTÉ

630 kg version – Schindler SMART lift – partial or full modernization:
• BLOCKMOD controller on the landing in an existing cabinet
• Ziehl Abegg frequency inverter in shaft
• TOPAZ Car operating panel
• Sassi gearless machine with compact frame (available in Ziehl Abegg version)
 
BLOCKMOD is:
• Choose a mastered solution suitable for each installation without modifying the existing controller on the landing.
• Benefit from technical support throughout the project by modernization specialists.
BLOCKMOD OCTÉ

 
You want to receive documentation or be contacted by a technical salesman:

Fields marked with an * are required